Residential Building Inspections

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Visit the online permit portal to apply for a new permit, schedule inspections, upload documents, pay fees, and more.

Residential Building Inspections

Required Residential Inspections

  • Footing. Consult the Footing Elevation Certificate before scheduling your inspection.
  • Foundation
  • Under Slab Plumbing, Electrical, Mechanical
  • Garage Floor Slabs
  • Basement Floor Slabs
  • Fireplace
  • Sewer Service Line – From Building to Main Tap.
  • Electrical (Temporary Service for Construction Trailer/Site) – a separate electrical application is needed for temporary electrical permit.
  • Rough-In (All framing, plumbing, electrical, HVAC, complete gas pressure). Consult the Residential Rough-In Priority List before scheduling your final inspection.
  • Portal prior to stucco application or other cover up.
  • Firewall separation – nail patterns and UL listing.
  • Nail patterns (Wall bracing, garage portal etc.)
  • Insulation Inspection
  • Final Approval – All inspections need to be complete before a Certificate of Occupancy (CO) or Temporary Certificate of Occupancy (TCO) is issued. Consult the Residential Final Priority List before scheduling your final inspection
  • Special inspections or after-hours third-party inspections are acceptable for concrete placement or structural framing

Temporary Certificate of Occupancy (TCO) Fees

  • $100 - Residential single-family, and each unit in a duplex or townhouse.
  • $200 - To extend a TCO for 30 days.

Certificate of Occupancy (CO)

  • All departments must pass and final grading and landscaping are required before a CO is issued.

Re-inspection Fees

  • Re-inspection fees are $100
  • Re-inspection fees may be assessed in the following situations:
    • The project is not ready for the requested inspection
    • The previously inspected non-compliant items have not been corrected
    • Address or permit numbers are not posted
    • Construction activities continue without prior approval
    • Structures are not accessible
    • Buildings are occupied without City authorization

After-hours Inspections

  • The minimum fee is $100 per hour with a two hour minimum
  • After hour inspections are subject to staff availability
  • Special inspections or after-hours third-party inspections are acceptable for concrete placement or structural framing

Additional Resources

Call 913-971-6200 for additional information.