City of Olathe
Home MenuBuilding Permit Application Guide
All Permit Applications Require:
- Online Submittal via the Customer Self-Service (CSS) Portal
24 hours a day, 7 days a week. - Homeowner Affidavit
To be completed by the property owner if performing work on their primary residence without a licensed contractor. - Construction Documents
Construction documents to be sealed by a design professional, with exceptions below. - Plan Review and Permit Fees
Invoices will be available for payment via the CSS Portal as the permit is processed and must be paid in sequence to continue the permit application.
Additional Submittal Requirements:
The table below provides a list of documents commonly required for many permit application types. When sealed documents are specified, one or more Kansas State Licensed Design Professionals are required. The table below is a guide to the common submittal requirements for these permit types, but special circumstances may apply depending on the nature of the project.
|
|
NC |
TF |
FF |
SFR |
RR |
RA |
RS |
MEP |
DM |
|---|---|---|---|---|---|---|---|---|---|
|
Sealed Construction Documents |
X |
X |
X |
X |
X* |
X* |
X* |
X* |
X* |
|
Construction Documents |
|
|
|
X |
X |
X |
|
|
|
|
Scope of Work |
|
X |
X |
X |
X |
X |
X |
X |
|
|
Engineering Calculations |
X |
X |
X |
|
|
|
|
|
|
|
Geo Technical Report |
X |
|
X |
|
|
|
|
|
|
|
Statement of Special Inspections |
X |
|
X |
X |
|
X |
|
|
|
|
Specifications |
X |
|
|
|
|
|
|
|
|
|
Accessibility Plan |
X |
X |
|
|
|
|
|
|
|
|
Homeowner Affidavit |
|
|
|
X^ |
X^ |
X^ |
X^ |
X^ |
X^ |
|
Utility Disconnect Letters |
|
|
|
|
|
|
|
X |
|
|
Civil Plan |
X |
|
X |
|
|
|
|
|
|
|
Sealed Plot Plan |
|
|
|
X |
|
|
|
|
|
|
Site Plan |
|
|
|
|
X |
X |
|
X |
|
|
Building Permit Authorization Letter |
X |
|
X |
|
|
|
|
|
|
|
KDHE Hazardous Material Analysis |
|
|
|
|
|
|
|
X* |
|
|
JOCO Septic Permit |
|
|
|
X* |
|
|
|
|
X* |
| JOCO Aquatic Code Operational Permit | (Public and Semi-Public Pools Only) | ||||||||
TOP LINE ABBREVIATIONS: New Commercial or Industrial Building (NC), Commercial Tenant Finish (TF), Commercial Footing and Foundation (FF), Single Family Residence, Duplex or Townhome (SFR), Residential Remodel (RR), Residential Addition (RA), Residential Accessory Structure, Deck and Shed (RS), Mechanical, Electrical or Plumbing (MEP), & Demolition (DM)
* Typically optional for residential projects, and/or other “non-sealed” requirements apply.
^ Optional for residential projects, if the homeowner is acting as the general contractor.
